top of page

Building Information Modeling ( Revit MEP + Architect )

Course Title: Building Information Modeling ( Revit MEP + Architect )

Duration:  25 Hrs 

Mode: Pre Recorded Online Classes 

Materials: Included 

Download access of Materials: Provided: 

​

 

Content Outline: 

Lighting Design for Buildings & Industries with DIALux

​

🌞1.0 Interfce & Walls ( Revit Architect) 2.5 Hrs
           â˜‘Revit Interface Creating a Single all (Generic Wall) Composition in Revit
           â˜‘Creating a Multi Wall Composition
           â˜‘Creating Curtain Walls,Grids and Mullion
           â˜‘Creating Stacked Walls
           â˜‘Creating Wall openings,Wall Sweap and Wall Reveal
 

🌞2.0 Floors & Ceiling, Doors & Windows (Revit Architct) 2.5 Hrs 
           â˜‘Creating Floors
           â˜‘Creating Different types of ceiling
           â˜‘Creating Sloped Floors
           â˜‘Doors & Windows 
 

🌞3.0 Stair & Roofs (Revit Architect) 2.5 Hrs
           â˜‘Stair,Ramp & Railings
           â˜‘Creating Roof by Footprint
           â˜‘Creating Roof by Extrusion
           â˜‘Creating Roof by Soffit
           â˜‘Creating Roof by Fascia
           â˜‘Creating Roof by Gutter
 

🌞4.0 Annotations & BOQ (Revit Architect) 5 HRs 
           â˜‘Annotations & Printing & Schedule 
           â˜‘Working on Annotations on Sheet 
           â˜‘Prjoect complete (Assignment)
 

🌞5.0 Starting new MEP Project (MEP) 2.5 Hrs
           â˜‘Starting an MEP Project
           â˜‘Linking Models from other discipline
           â˜‘Copy/Monitor & creating levels
           â˜‘Making different Views
 

🌞6.0 HVAC Load Calcualtions (Mechanical) 2.5 Hrs
           â˜‘Creating Spaces
           â˜‘Creating Plenum
           â˜‘Creating Energy Model
           â˜‘Creating Zones
           â˜‘Creating Reports

​

🌞7.0 HVAC Duct Design (Mechanical) 2.5 Hrs 
           â˜‘Duct System Design 
           â˜‘Adding Mechanical Equipments
           â˜‘Adding Ducts
           â˜‘Duct Adjustment
           â˜‘Create Automatic Duct System Layout
           â˜‘Test System
           â˜‘Duct Placeholders
           â˜‘BOQ Preparation
 

🌞8.0 Hydronics (Mechanical- Plumbing) 2.5 Hrs 
           â˜‘Hydronic System Design Closed Loop 
 

🌞9.0 Fire Fighting System Desing ( Fire Safety ) 2.5 Hrs
           â˜‘Preparing the projects
           â˜‘Adding Sprinklers
           â˜‘Placing Mechanical Equipment
           â˜‘Automatics piping system
           â˜‘BOQ Preparation
 

🌞10.0 Plumbing System Design ( Plumbing ) 2.5 Hrs 
           â˜‘Design Open Loop Piping System   
           â˜‘Adding Plumbing fixtures & Equipments
           â˜‘Adding & Modify Plumbing Pipes
           â˜‘Creating Automatic Piping Layout
           â˜‘Test the System
           â˜‘BOQ Preparation
 

🌞11.0 Electrical System Design (Electrical) 2.5 hrs
           â˜‘Adding Electrical Fixtures & Equipments
           â˜‘Create Electrical Circuits
           â˜‘Placement of Panel Board
           â˜‘Circuits & Circuit Wiring
           â˜‘Placement of Sockets 
           â˜‘BOQ Preparation

Copy of Electrical Jan  (3).png
bottom of page